300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

More concrete, more crane sections, more progress

Thanks again to Bernard for sending this update in. The vantage point in this photo is really quite amazing and the progress is very visible from day to day now.

Here's the latest update…
- You can see that a concrete pumping boom is now in place on top of the hotel lift core.

- The last bit of slab around that core is almost ready to pour;

- the formwork for the next level (the floor of basement level 6, going by the plans) is proceeding apace in the NW corner;

- a lot more formwork is in place for the lift pit for the res tower;

- there's a red crane tower section sitting against the far side of the pit. My guess is that it's going to be erected next to the res tower, with the foundation to be poured in a socket partially visible behind the platform on the left. I expect the third, smaller crane in the centre of the site will be removed at that time, as it doesn't have a jacking frame to allow it to 'climb' with the construction;

- there are column foundations being hammered out close to the base of the near crane. These are for the columns that support the southern edge of the commercial tower;

- there's more dirt being removed from the site. It's too deep for even the long arm excavator, so it's lowering it's bucket as low as possible, then the excavator in the pit is lifting dirt up high and tipping it into the bucket.


…and to show what the site looks like now…
IMG_20160118_092535.jpg




-i

Wed Jan 20 04:28:11 2016
Photos, Construction, Day, Aerial, GuestContribution, Crane, Concrete