300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Residential tower lift core concrete slab being poured in

The concrete slab around the residential tower has finally started to be poured in place. At a distance it doesn't look like a huge area, but zooming in you can see how deep some of the parts actually are and that will all require filling in.

Here's another nice update from Bernard…
- Concrete is being poured around the base of the res tower lift core. That's a *lot* of concrete going in to fill that gap!
- More formwork going up
- currently about to pump concrete, I suspect to finish the commercial tower lift core foundation
- the long arm excavator that was lifting dirt out yesterday has gone


A photo from above…
IMG_20160121_111641.jpg




Here's a zoomed in photo showing more detail of the site around the residential tower…
IMG_20160121_111649.jpg


Keen to see how this gets on over the next couple of days!

-i

Fri Jan 22 14:27:44 2016
News, Construction, Day, GuestContribution, Concrete