300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

The fourth crane has been assembled on site

Some great developments last week. The fourth crane is now assembled and a service elevator has been put up next to the hotel lift core. The progress has really accelerated. Check out more detailed updates from Bernard below…
- we have a fourth crane on site! This one doesn't have a jacking frame, like the smaller one in the middle of the site. I presume that will come as the res tower starts to climb;
- the Basement 5 slab has been poured in the NW corner of the site (that would have been the concrete trucks you saw on North Quay over the weekend);
- the first level of walls for the res tower lift core has been poured, and formwork is being removed;
- more column foundations being poured (the Eastern-most of the three large columns at the southern end of the commercial tower is being poured this morning;
- the mystery platform on the northern edge next to Ann St has a transformer on it. You can see lighting on the hotel core formwork is now lit up.

IMG_20160223_090933.jpg



- pouring the second part of the Basement 5 slab around the hotel core
- elevator constructed beside hotel core
- formwork going up for Basement 4 slab in NW corner
- formwork constructed around column base on NE edge of res tower pit
- large circular column was poured yesterday at SE edge of res tower footprint
- concrete edge for the SW side of the res tower pit bottom was poured yesterday. Don't know if they're going to backfill with dirt between that and the lift core or just leave a void