300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks

Painting around the lower levels and hotel sides plus number 33 on the hotel core

Updates between 11th of September and 15th of September

News and gossip from the site

Updates between 4th of September and 8th of September


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 16th and 20th of May

Not as many updates as last week, but it looks like the crews keep working every single weekend for the time being. Check out the detailed daily updates below from Bernard.

16 May -
- Basement 1 slab poured SW of hotel core over the weekend (this included the large beams)
- reinforcing being placed for loading bay ramp
- formwork over loading bay for ground floor slab progressing. Some pretty sizeable cast-in beams here, by the looks of the formwork
- reinforcing going in for the eastern side of the Basement 5 slab next to the commercial core
- Basement 4 formwork going up West and North of the commercial core
- backfilling continues around the res core
- work still ongoing on the res core climbing formwork. No pumping boom yet.

IMG_20160516_122707.jpg


18 May -
- pouring the rest of Basement 5 east of the commercial core
- looks like the concrete pump has broken down, they've resorted to using a crane bucket
- boom is out for pouring somewhere near the loading dock ramp on the north side of the hotel core. Not sure if it's the ramp itself, view is blocked by the hotel core
- Basement 4 formwork on West & North of commercial core nearly done
- some scaffolding erected in porte cochere area West of hotel core
- surface finishing underway in podium area. Still a lot of spoil to move here, not sure if they'll use it all for backfilling around the res core

IMG_20160518_114329.jpg




-i

Mon May 23 16:54:04 2016
Photos, Construction, Day, GuestContribution