300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks

Painting around the lower levels and hotel sides plus number 33 on the hotel core

Updates between 11th of September and 15th of September

News and gossip from the site

Updates between 4th of September and 8th of September


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 17th of October and 21st of October

Here are some updates from the past week.

17 October -
Looks like no work on site again today.


18 October -
- some concrete was poured around the hotel core this morning, but I can't see what
- pouring what looks like the ground floor slab north of the commercial core. You can see the angled passageway for pedestrian access into the site from the Ann St side
- formwork platform nearly done for Basement 2 (I think) around the res core
- lots of formwork under construction in the podium area. Hard to keep track of it if you don't see it every day!

IMG_20161018_123237.jpg


19 October -
- you can see the rough shape of the hotel tower in the scaffolding on top of the podium levels there
- pouring another level of the hotel core
- podium 1 formwork going up West and sorry of the commercial core
- Basement 2 formwork nearly finished around res core
- formwork still being built in the podium area for Basement 2, I think

IMG_20161019_135553.jpg


IMG_20161019_103041.jpg IMG_20161019_103046.jpg




21 October -
- Formwork going up for the first level of the hotel tower proper, I think
- you can see on the George St frontage just east of the commercial core where a rotating entry door is going to go
- getting ready for a Basement 2 pour eat of the res core
- still building formwork in the podium area

IMG_20161021_135759.jpg


-i

Sat Oct 22 14:35:13 2016
Construction, Day, GuestContribution