I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 11th of November and 19th of November

I've been away on holidays for about a month so only now starting to catch up on all the updates that have come in. Below are updates between the 11th and the 19th of November from Bernard. Enjoy!

11 November -
- concrete pumping at the hotel tower (I suspect for columns on the other side of the core)
- formwork around the commercial core. Looks like the columns near George St are extra high, so the building lobby will be very high
- only activity near the res core appears to be at the carpark ramp. You can see a slot in the walls where the ramp slab will be
- formwork build continuing in the podium area

IMG_20161111_121245.jpg


15 November -
- the formwork for the wall just to the right of the hotel core has jacked up a level
- you can see a bit of the hotel tower for slab with the wavy edge just left of the hotel core
- getting ready for the podium 3 (?) level pour north of the commercial core
- pouring the commercial core
- formwork going up around the res core for Basement 1
- carpark access ramp formwork going up
- still working on basement 1 formwork in the podium area
- the crane in the podium area (nearest to camera) has jacked up over the weekend (I saw the tower segments there last week)

IMG_20161115_122212.jpg


17 November -
- nearly ready for another slab pour for the hotel. I wonder if they're going to scaffold externally all the way to the top?
- last part of podium 2 slab looks nearly ready to pour north of the commercial core
- formwork expanding rapidly around the res core, nearly done in the podium area.
- I'm wondering how they're going to build around the loading platform on the Adelaide St boundary. It's outside of the tower footprints, but will get in the way of the podium build, so maybe we'll see part of that removed soon
- the crane in the middle of the site is going to need to be jacked up soon, it's looking pretty low there!

IMG_20161117_144158.jpg




18 November -
- reinforcing etc getting ready for slab pour north of hotel core
- podium 2 slab poured north of commercial core this morning
- part of carpark ramp read of res core poured
- tensioning ducts and reinforcement being placed in podium area for Basement 1 level

IMG_20161118_171608.jpg


19 November -
- slab poured on north side of hotel core
- podium 3 formwork being built between hotel and commercial cores
- res core has climbed a level
- formwork covering the carpark ramp that was poured yesterday
- reinforcing being laid in podium area

IMG_20161119_122855.jpg


-i

Thu Dec 15 20:15:44 2016
Photos, Construction, Day, GuestContribution