300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 12th of December and 16th of December

Here's the final real update of activity before the Christmas break period set in. Enjoy your Holiday Season!

12 December -
- scaffolding and formwork on the hotel tower
- scaffolding has filled the commercial foyer area, formwork being built over. Looks like there are going to be some pretty thick car in beams in this slab
- reinforcing and post tensioning ducts being laid for last bit of Basement 1 north of the res core
- some formwork and reinforcing being built in the far south east corner of the podium area
- a concrete pumping truck setting up on the Adelaide St platform, I suspect to pour the support walls for the carpark ramp behind the near crane

IMG_20161212_120902.jpg


13 December -
- formwork & reinforcing north of hotel and commercial cores
- still prepping for the last Basement 1 section north of the res core
- some crane tower sections sitting on a truck on the North Quay loading area
- the crane at the north west corner is currently lifting in a tower section - climbing again!

IMG_20161213_120951.jpg




14 December -
- still jacking up the crane in the northwest corner
- pouring the commercial core
- pouring Basement 1 slab northeast of the res core (looks like only half the remaining Basement 1 area will be done today)
- formwork being built in the eastern part of the podium area

IMG_20161214_104655.jpg


16 December -
Looks like no work today.

- formwork still going up around the hotel
- formwork has nearly covered the commercial foyer, with reinforcing and post tensioning ducts going in north of the core
- reinforcing and post tensioning ducts being laid for the last bit of Basement 1 north of the res core
- formwork starting to cover the podium area