300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 9th of January and 13th of January

It's full steam ahead again at the construction site. Here's an update on the week's activity from Bernard.

10 January -
They're back at work this week, after three weeks off, I think.
- laying reinforcing and post-tensioning ducts north of the commercial core
- doing the same for the last bit of Basement 1 North of the res core
- the bit of formwork that's set at about a 45 degree angle near the George/Adelaide St corner in the podium area is most likely the set down for the escalators at that location

IMG_20170110_130039.jpg


11 January -
- Can't see much activity on the hotel tower
- you can see the shape of the first floor slab for the commercial tower in the formwork near the George St side
- still laying reinforcing etc north of the commercial core and north of the res core
- pumping concrete into a column form southeast of the res core
- building formwork in the podium area

IMG_20170111_110446.jpg




12 January -
- pouring the slab north of the commercial core
- laying reinforcing north-east of the commercial core
- pouring the last bit of Basement 1 North of the res core
- building more formwork in the podium area, for both the Podium 1 level (I think that's what the plans call it) and the wall parallel to Adelaide St.

IMG_20170112_100110.jpg


13 January -
- some formwork construction going on at the hotel tower, I think. Hard to see.
- reinforcing & post-tensioning ducts going in NE of the commercial core
- pouring concrete for the wall parallel to Adelaide St in the podium area
- lots of formwork going up there as well

IMG_20170113_132320.jpg


-i

Sat Jan 14 13:56:51 2017
Photos, Construction, Day, GuestContribution