300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you want to get in touch, please email me on
.


Recent Posts

Final update for 300 George Street

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 16th of January and 20th of January

17 January -
- some wavy formwork being constructed on the northern edge of the hotel tower
- pouring the slab northeast of the commercial core
- formwork going up southeast of the res core for various walls
- reinforcing being laid in podium area, formwork has covered most of it
- more scaffolding going up near the Adelaide St frontage

IMG_20170117_091421.jpg


18 January -
- wavy formwork wall on the North edge of the hotel tower looks complete
- laying reinforcing SE of the commercial core
- getting ready to pump concrete somewhere around the commercial core (perhaps the core itself?)
- more formwork build in the podium area, including the carpark access ramp just the other side of the crane that will go out to Adelaide St

IMG_20170118_114030.jpg




19 January -
- some activity on the hotel tower, but can't see what they're doing
- laying reinforcing and post-tensioning ducts SE of the commercial core
- formwork going up for various walls around the res core
- still laying reinforcing and P-T ducts in the podium area
- a concrete pump on the Adelaide St loading platform appears to be pumping through a hole in the platform. This might connect to the boom on the res core, which looks like it's pouring columns in the carpark ramp.

IMG_20170119_121857.jpg


20 January -
- formwork build continuing on hotel tower
- laying P-T ducts SE of commercial core
- some formwork for a stair tower North of the commercial core
- formwork for various walls being built south of res core
- laying reo & P-T ducts in Podium area