300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you want to get in touch, please email me on
.


Recent Posts

Final update for 300 George Street

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 23rd of January and 27th of January

More updates from Bernard for the past week, enjoy!

23 January -
- reinforcing being laid on hotel tower
- wavy formwork built on Southwest side of hotel core as well
- pouring slab southeast of commercial core
- still building formwork South of res core
- laying reo & P-T ducts in Podium area

IMG_20170123_101416.jpg


24 January -
- a *lot* of formwork on the hotel tower - it almost looks like they're planning to pour a metre-thick slab of concrete!
- formwork being built between the hotel and commercial cores
- still building formwork around the res core
- pouring a strip of concrete between the commercial core and the podium area
- you can see the ground floor building outline in the formwork in the podium area

IMG_20170124_130039.jpg




25 January -
- seems pretty clear there is going to be a very thick slab poured on the hotel!
- formwork build continuing between goal and commercial cores
- pouring a wall joining the east corner of the res core
- laying reo & P-T ducts in Podium area. You can see the framing for various wall lines, including what looks like a rotating door for the commercial building foyer

- I have just noticed that the middle crane on the site has been removed! It was there Friday, but gone on Monday.