300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you want to get in touch, please email me on
.


Recent Posts

Final update for 300 George Street

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 6th of February and 10th of February

Another detailed updated from Bernard. Enjoy!

6 February -
- lots of reinforcing and post-tensioning ducts on top of the hotel tower. I presume there's a reason for the P-T to be in the wave-like shape, probably to do with the compressive stresses it will create in the thicker slab.
- almost looks ready to pour the slab between the hotel and commercial towers
- looks ready to pour the slab south of the res core against Adelaide St
- scaffolding going up near the George/Adelaide corner

IMG_20170206_140942.jpg


8 February -
- still laying reinforcing and P-T ducts on the hotel tower, between the hotel and commercial buildings, and South of the res core
- formwork build continuing South and East of the commercial core, and east of the res core
- some scaffolding going up in the port cochere area on the far side

IMG_20170208_140955.jpg




9 February -
- pouring of the massive slab on the hotel tower has begun. Looks like a two-part pour, with about half the thickness done
- pouring of the slab between the hotel & commercial towers, the cast-in beams have been filled with concrete
- formwork build continuing east of the commercial core and north of the res core
- reinforcing being laid south of the res core and in the western half of the podium area


10 February -
- first half of the thick slab on the hotel tower has been poured yesterday
- the slab between the hotel and commercial buildings has been poured this morning
- the slab south of the res core has also been poured this morning
- lots of reinforcing being placed for the carpark ramp and adjacent slab in the podium area