300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
This blog is in no way affiliated with the developer of the building site.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

Updates between 7th of August and 11th of August

Updates between 31st of July and 4th of August

Time lapse videos for all of April

W Hotel curved window installation

Updates between 24th of July and 28th of July

Updates between 17th of July and 21st of July

North Quay crane extended, new number 25 painted on the elevator shaft

Updates between 10th of July and 14th of July

Night time construction zoom in fun

Close up photos of work on the W Hotel tower

Photos from around the site perimeter

Updates between 3rd of July and 7th of July

Scaffolding removed around the commercial tower

Updates from different angles, plus a video of the work on top of the W hotel tower

Updates between 26th of June and 30th of June

Updates between 19th of June and 23rd of June

Multiplex Appointed To Build Brisbane Quarter Commercial Tower

Updates between 12th of June and 16th of June

Updates between 5th of June and 10th of June

Cranes shooting rainbows over Brisbane


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 1st of May and 5th of May

Only a short update from Bernard for the past week due to public holidays. Enjoy!

2 May -
- slab on hotel tower has been poured
- western half of podium area has been poured today
- some formwork around res core, and I think columns for the commercial tower

IMG_20170502_163135.jpg


4 May -
- formwork nearly done for for next level of the hotel
- you can see the glass facade has only been fitted to the lowest level facing Ann St
- lots of formwork for a concrete room just south of the commercial core
- columns in the commercial building area have been poured to quite a height - must be a very high ceiling planned for that floor!
- formwork expanding around res core, reinforcing being laid in eastern half with locations of post-tensioning anchors marked
- scaffolding starting to cover the podium area, perhaps for the last concrete pour (the small columns look like the reinforcing bars are bent over to sit within the slab - the three large columns are within the footprint of the commercial tower)

IMG_20170504_144937.jpg




-i

Tue May 9 15:27:56 2017