300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks

Painting around the lower levels and hotel sides plus number 33 on the hotel core

Updates between 11th of September and 15th of September

News and gossip from the site

Updates between 4th of September and 8th of September

Updates between 28th of August and 1st of September

The W Hotel tower reaches the big 30 levels

Time lapse videos for all of May

George Street closed off on the weekend with a mobile crane

Updates between 21st of August and 25th of August

Updates between 14th of August and 18th of August

Updates between 7th of August and 11th of August

Updates between 31st of July and 4th of August

Time lapse videos for all of April

W Hotel curved window installation

Updates between 24th of July and 28th of July

Updates between 17th of July and 21st of July


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 8th of May and 19th of May

This is a combined update from Bernard for the past two weeks, since there was little activity the week earlier.

9 May -
- another day, another floor on the hotel… :-) Currently doing the fourth floor above that thick slab
- some very tall columns have been poured for the commercial tower! Scaffolding going up to support the slab formwork
- pouring the slab East of the res tower, formwork nearly finished for the west half
- formwork being built for the podium area. Looks like a complicated slab, with some pretty deep cast-in beams. This may be the last slab pour for the podium area.

IMG_20170509_140701.jpg


15 May -
- reinforcing being laid atop the hotel tower. Now on the 5th level above the transition slab
- formwork being laid on the scaffolding north of the commercial core
- post-tensioning ducts being laid west of the res core
- formwork build continuing in the podium area. Looks like those cast-in beams are going to be very deep.

IMG_20170515_133122.jpg




Here's a picture of the glass curtain wall being put up.
IMG_20170516_092113.jpg


17 May -
- formwork already going up for next floor at SW of hotel, looks ready to pour to north
- pouring hotel core
- scaffolding and formwork expanding over north side of commercial tower
- pouring slab on west side of res core
- still building formwork in podium area, with post-tensioning ducts being laid in eastern part. Looks like there might be a significant height difference between parts of this slab.

IMG_20170517_125736.jpg


-i

Sun May 21 23:31:57 2017
Photos, Construction, Day, GuestContribution