300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks

Painting around the lower levels and hotel sides plus number 33 on the hotel core

Updates between 11th of September and 15th of September

News and gossip from the site

Updates between 4th of September and 8th of September

Updates between 28th of August and 1st of September

The W Hotel tower reaches the big 30 levels

Time lapse videos for all of May

George Street closed off on the weekend with a mobile crane

Updates between 21st of August and 25th of August

Updates between 14th of August and 18th of August

Updates between 7th of August and 11th of August

Updates between 31st of July and 4th of August


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 19th of June and 23rd of June

Another awesome update from Bernard for the past week…

19 June -
- SW slab on the hotel poured, reinforcing being laid for N slab
- pouring a higher section of slab just E of the res core
- pouring columns just SE of the res core (I think the next floor will show the outline of the tower)
- the formwork box S of the commercial core looks more complete, with what looks like long bolts being inserted to hold the sides in place when it's poured

IMG_20170619_133518.jpg


21 June -
- slab poured on SW, reinforcing being laid on N of hotel tower
- pouring something on the far side of the commercial core
- pouring the res core
- laying post-tensioning ducts W of the res core
- wet concrete is visible inside the large box formwork between the commercial core and the nearest crane

IMG_20170621_123310.jpg




22 June -
- N side of hotel tower poured, formwork going up for SW side next level
- scaffolding going up around the southern perimeter of the commercial tower outline
- post-tensioning ducts being laid over the area West of the res core

IMG_20170622_134943.jpg


23 June -
- formwork build on hotel tower
- scaffolding build around commercial tower South side in podium area
- still laying reinforcing & post-tensioning ducts West of res core