300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 19th of June and 23rd of June

Another awesome update from Bernard for the past week…

19 June -
- SW slab on the hotel poured, reinforcing being laid for N slab
- pouring a higher section of slab just E of the res core
- pouring columns just SE of the res core (I think the next floor will show the outline of the tower)
- the formwork box S of the commercial core looks more complete, with what looks like long bolts being inserted to hold the sides in place when it's poured

IMG_20170619_133518.jpg


21 June -
- slab poured on SW, reinforcing being laid on N of hotel tower
- pouring something on the far side of the commercial core
- pouring the res core
- laying post-tensioning ducts W of the res core
- wet concrete is visible inside the large box formwork between the commercial core and the nearest crane

IMG_20170621_123310.jpg




22 June -
- N side of hotel tower poured, formwork going up for SW side next level
- scaffolding going up around the southern perimeter of the commercial tower outline
- post-tensioning ducts being laid over the area West of the res core

IMG_20170622_134943.jpg


23 June -
- formwork build on hotel tower
- scaffolding build around commercial tower South side in podium area
- still laying reinforcing & post-tensioning ducts West of res core

IMG_20170623_115905.jpg