This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you want to get in touch, please email me on
.


Recent Posts

Final update for 300 George Street

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 3rd of July and 7th of July

Huge update for last week from Bernard! Different angle on photos too so that everything can be fit in. The W Hotel tower is getting big!

3 July -
- raising the safety cages and laying reinforcing on the hotel tower
- pouring the next stage of the massive beam S of the commercial core
- formwork being installed for the parapet wall S of the res core

IMG_20170703_120807.jpg


4 July -
- pouring the hotel core
- slab poured on SW of hotel, reinforcing being laid on N
- looks like commercial tower footprint S of core has been tidied up - possibly in preparation for scaffolding & formwork for the slab sections to catch up with the N side
- columns being poured around the res core

I think the crane in the NW corner near the hotel will have to jack up again soon.
Also looks like a couple of truckloads of metal racks with more windows for the hotel facade have turned up - you can see one of the trucks in the southern loading dock in the photo.

IMG_20170704_121029.jpg


5 July -
- formwork for the next level on the SW of the hotel, looks nearly ready to pour the N side
- formwork supports going up S of the commercial core
- with the formwork shutters removed, it looks like that solid concrete 'beam' is 5-6 metres thick!
- more scaffolding going up around res tower, with columns being poured

IMG_20170705_153434.jpg




6 July -
- pouring N side of hotel, formwork going up for SW side
- formwork supports continuing to go up S of commercial core
- more scaffolding around the res tower footprint
- some scaffolding being removed from SE corner of podium area

IMG_20170706_103653.jpg


7 July -
A bit wet out today, not much work visible right now.
- formwork done, reinforcing being placed SW side of hotel tower
- formwork supports gradually filling the space S of the commercial core
- the outline of the res tower is fairly well defined by scaffolding right now