300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
This blog is in no way affiliated with the developer of the building site.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

Updates between 7th of August and 11th of August

Updates between 31st of July and 4th of August

Time lapse videos for all of April

W Hotel curved window installation

Updates between 24th of July and 28th of July

Updates between 17th of July and 21st of July

North Quay crane extended, new number 25 painted on the elevator shaft

Updates between 10th of July and 14th of July

Night time construction zoom in fun

Close up photos of work on the W Hotel tower

Photos from around the site perimeter

Updates between 3rd of July and 7th of July

Scaffolding removed around the commercial tower

Updates from different angles, plus a video of the work on top of the W hotel tower

Updates between 26th of June and 30th of June

Updates between 19th of June and 23rd of June

Multiplex Appointed To Build Brisbane Quarter Commercial Tower

Updates between 12th of June and 16th of June

Updates between 5th of June and 10th of June

Cranes shooting rainbows over Brisbane


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Updates between 24th of July and 28th of July

Here's the update for the past week, from Bernard.

24 July -
Showing the insulation and services (fire, stormwater) being fitted below the top slab, which is the roof of the podium area.

The darker patches along the edge of the slabs is grout filling in the boxes where the post-tensioning cables are tightened & anchored.

IMG_20170724_090536.jpg

- L22 formwork mostly complete on SW, blade wall forms being assembled to N
- the office core mystery is solved! The climbing formwork is being shrunk, as the southernmost bank of lifts only service the podium floors, not the highrise tower (I could have probably figured that out last week if I'd remembered to look at the drawings!)
- still laying reinforcing S of the office core
- starting to lay reinforcing for the res tower slab

IMG_20170724_120230.jpg




25 July -
- L22 reinforcing being placed on SW of hotel, formwork mostly complete on N
- climbing formwork re-assembly on office core nearly finished
- laying reinforcing and post-tensioning ducts on res tower
- while I type this, the southernmost crane is hosting a load of air-conditioning ducting to a loading platform at the SE corner of the podium area. (The truck with two crates of it is visible in the southern loading dock in the photo). The internal fitout is progressing, though we can't see most of it.

IMG_20170725_140114.jpg


27 July -
- pouring the hotel core
- SW side of L22 poured, reinforcing being laid to N side
- reconfiguration of the jacking formwork on the office core looks largely complete
- reinforcing still being laid S of office core and around res core

IMG_20170727_133453.jpg


28 July -
- forms for blade columns going up SW of hotel, reinforcing being laid to N side
- not much visible happening on office tower
- SE side of res slab has been poured, still laying post-tensioning ducts to NW side

IMG_20170728_140735.jpg


-i

Tue Aug 1 15:08:53 2017
Photos, Construction, Day, GuestContribution