300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks

Painting around the lower levels and hotel sides plus number 33 on the hotel core

Updates between 11th of September and 15th of September

News and gossip from the site

Updates between 4th of September and 8th of September

Updates between 28th of August and 1st of September


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

Remaining photos and updates for November 2017

As I mentioned in a previous post I'm going to be reducing the number of updates I post on this blog. Updates will now happen on a monthly basis and will have a new format.

I've got a few more things to share for November, so this is the remainder of the photos that I took and some updates from Bernard as well. Enjoy!

On the North Quay side, a metal structure is taking shape at the ground level. I am assuming this is going to be an entrance of some sort. The balconies are getting glass railings across all three levels too.
IMG_0060.jpg


IMG_0056.jpg IMG_0057.jpg


IMG_0058.jpg IMG_0059.jpg




Updates from Bernard…

28 November -
- hotel: cladding on the northern part complete up to L20. Formwork being built up on top of the core for what may be the last slab pour. Steel pieces being assembled on the podium level just south west of the tower, may be facade or roof elements
- office: climbing formwork looks mostly complete. The stairs suggest the southern half will always lag the northern half by at least a floor. A new personnel lift being installed to the Ann St frontage.

IMG_20171128_100650.jpg


30 November -
- hotel: looks like L34 formwork is largely complete. Cladding work continuing. I'm wondering if the steelwork being assembled on the podium just south of the hotel is the roof for the lift core.
- office: a large steel frame is being assembled in the NW corner, with reinforcing inside steel tubes and steel beams connecting them. Possibly a mezzanine floor, would need to check the plans.
- blue formwork placed along the Adelaide St frontage. I'm guessing the final bit of slab here will be poured soon.

IMG_20171130_121535.jpg


-i

Sun Dec 10 22:50:33 2017
Photos, Construction, Day, GuestContribution