This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you want to get in touch, please email me on
.


Recent Posts

Final update for 300 George Street

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

January 2018 Updates

Happy New Year! Welcome to the first update from 300 George Street for 2018. There was quite a big break on site around Christmas and New Year but once work was back on, lots of developments happened. Lets see some photos from the site and surrounds.

First I have to include some fireworks from 2017/18 New Year's Eve. The weather was not the best that night and smoke hung around so it was hard to take decent photos, but here are a few snaps…
DSC03491.JPG
DSC03490.JPG DSC03495.JPG
DSC03467.JPG DSC03471.JPG DSC03476.JPG




Work resumed around the 8th of January and it was full steam ahead with completing the W Hotel roof…

DSC03499.JPG DSC03501.JPG
DSC03591.JPG


The roof is made up of several sections with interesting shapes.

DSC03592.JPG DSC03593.JPG
DSC03598.JPG



The retail floors are coming along nicely…

IMG_0273.jpg IMG_0274.jpg IMG_0275.jpg


I've even noticed some work going on after 6pm!
IMG_0346.jpg


The footpaths on George Street have now been closed off.

IMG_0344.jpg IMG_0348.jpg



Some updates from Bernard for the month…
2 January 2018 -

Doesn't look like a lot has happened over the past ten or eleven days, and no work today.

- hotel: lots of cladding complete. Part of the roof has been constructed.
- office: reinforcing laid, but still no slab poured on top of the blue formwork. The left (southern) part of the lift core has climbed up level with the right (northern) part.
- the rest of the Adelaide St frontage has been filled to street level.

9 January 2018 -

- hotel: crane hooked up to the section of roof that has been built on the podium level between the hotel and res towers. Looks like it's getting ready to lift it, perhaps on to the top of the hotel.
- office: northern section of the slab has been poured onto the blue formwork

11 January 2018 -

- hotel: work continues to around roof level. Safety cages are being removed from the Ann St side, perhaps to allow glazing to be installed for the remaining floors.
- office: reinforcing being placed for core walls. Reo being laid for floor slab just south of core
- work continuing on finishing the facade glazing & panels facing George St.

16 January 2018 -

- hotel: glazing done up to L30. Scaffolding being removed from the top of the lift core.
- office: core walls being poured. Safety cages being assembled around the entire tower perimeter.
- cosmetic cladding is spreading along the Ann St frontage of the podium. I'll take a pic from ground level sometime, can't see it from here.

17 January 2018 -

- hotel: scaffolding being removed from to of lift core.
- office: northern core jacked up. Formwork for slab between southern core and South wall being built.

18 January 2018 -

- hotel: the roof that was assembled down on top of the podium between the hotel and res towers is now sitting on top of the lift core
- office: southern half of the core has climbed to match the northern half.

23 January 2018 -

- hotel: another section of roof just north of the lift core has been installed. Glazing up to L31
- office: pouring concrete on the west side of the lift core. Looks like a new pice of climbing formwork structure is being assembled on the slab north of the core

25 January 2018 -

Apparently the hotel is scheduled to open on 15 March, and they're taking bookings!

- hotel: panelling has reached the top, for part of the eastern walls. Only two more levels to be glazed. Most of the hotel roof appears to be in place.
- office: northern half of the core jacking up. Reinforcing being placed for the southern half.
- lots of work to the facade of the podium levels facing George & Adelaide Streets.

31 January 2018 -

- hotel: not much progress visible externally, though I'm sure they're pretty busy inside, with the hotel due to open in just six weeks!
- office: core formwork has jacked up, more steel beams and blue formwork being installed east of the core
- podium facade being finished along S side



…and photos from another angle…

IMG_20180102_121151.jpg IMG_20180102_121255.jpg

IMG_20180109_142304.jpg IMG_20180111_121402.jpg IMG_20180116_124346.jpg
IMG_20180118_115910.jpg

IMG_20180123_123333.jpg IMG_20180123_123348.jpg IMG_20180125_121512.jpg
IMG_20180130_124223.jpg


-i

Sat Feb 3 18:00:27 2018
Photos, Construction, Day, GuestContribution