300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October

October fog blankets the site

Updates between 2nd of October and 6th of October

Riverfire 2017 photos - jets, helicopters and fireworks

Painting around the lower levels and hotel sides plus number 33 on the hotel core

Updates between 11th of September and 15th of September

News and gossip from the site

Updates between 4th of September and 8th of September

Updates between 28th of August and 1st of September

The W Hotel tower reaches the big 30 levels


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

17-Sep-2017
Updates between 11th of September and 15th of September
Here's an update from Bernard for the past week. Level 32 of the lift core has been reached, this should be the final level so just the rest of the tower floors need to be poured to catch up.
29-Sep-2016
Panoramic shots from the ground level
I walked past the site earlier on the week and took these panoramic shots. I especially like the one with all the signage. Enjoy!
01-Feb-2016
On the ground look at the construction
I went for a little peek around the Adelaide St and North Quay sides of the construction site over the weekend to see what I could get a look at. These are the pictures I took from the ground level. There are bobcats a plenty around the site!
15-Jun-2015
A checkin at the dig site
Here's a photo I found from a checkin on Facebook. It shows the dig site in its full glory.
11-Jan-2015
Panoramic shot of the dig site
Since not much else apart from digging appears to be happening at the site, I've gone past and taken some photos to put together into a panorama shot. Here's what it came up as.