300 George Street Blogumentary
HomeDemolitionExcavationConstructionTrouble
I'm looking for someone to acquire and take over 300george.com. This has been an amazing blogumentary project but I simply do not have the time to keep it going. If you're interested, please email me offers at .
300 George Street
Brisbane, Australia
Blogumentary
This is a blogumentatry project that is following the construction and development of the building complex planned for 300 George Street, Brisbane, with the aim of capturing the history from demolition of the old court building to the final completion of the three new towers.
300 George Street Brisbane is the site for Brisbane Quarter and W Hotel, Brisbane.
This blog is in no way affiliated with the developer, leasing agents or any businesses planned to operate at 300 George Street Brisbane.

If you have photos or news to submit, please email them to
.

You can also contact me via the FaceBook page:
300 George Street Brisbane
.


Recent Posts

August 2018 Updates

July 2018 Updates

June 2018 Updates

May 2018 Updates

April 2018 Updates

March 2018 Updates

February 2018 Updates

January 2018 Updates

December 2017 updates

Remaining photos and updates for November 2017

Some cool shots from up high

Links to past time lapse videos

Reducing the frequency of updates and content on this Blog

Updates between 20th of November and 24th of November

Updates between 13th of November and 17th of November

Updates between 6th of November and 10th of November

Updates between 23rd of October and 3rd of November

A new crane installed at the commercial building site

Updates between 16th of October and 20th of October

Updates between 9th of October and 13th of October


Official Pages

300 George Brisbane
Brisbane Quarter
Brookfield Multiplex
Brisbane Development
Wikipedia

16-Jun-2016
Close up view of that truck in the hole
This is a bit of a follow up to the previous post I wrote about the break in on site. Here's a photo submitted anonymously that shows the truck in the hole after the entire joy ride incident was already over.
10-Jun-2016
It was a break in not an accident
I wrote earlier on the week about the accident on site with a dump truck being stuck in a hole. Turns out this was no accident at all but a break in.
06-Jun-2016
Accident on site
There's been an accident on site on Sunday it appears. Thanks to Bernard for sending in this photo. You can see below what appears like a truck/tractor has fallen into a hole on the residential tower site. The time lapse footage shows what happened below.
15-Jul-2014
Upgraded security now with a DOG K-9 Unit
The security provider has changed from Sargent to Challenger Knight and they've added a dog K-9 unit too. Every time I've walked past the site, there has been a security guard and a dog on alert. I'm sure they don't want all that asbestos being stolen!
04-Jul-2014
Things are heating up over asbestos and lack of payment
Walked past the site to check it out for myself today to see if it's really shut down. Yes it is. There is some picketing going on outside too. Will be interesting to see how it turns out. What do you all think, leave a comment.
03-Jul-2014
Demolition stopped due to asbestos issues
Thanks to a friend of mine for pointing this article out: http://www.brisbanetimes.com.au/queensland/asbestos-fears-as-old-courts-demolition-grinds-to-a-halt-20140703-zsvba.html. Looks like there are quite a few issues with this development, from liquidation issues to now this asbestos problem. I'll have more about the liquidation of P&K later on when I get some time away from work to post about it